We are aiming to satisfy the needs of the customers around the globe.. Moreover, all our generation techniques are in compliance with ISO9002 expectations. In 2000, EPG took the lead in attaining ISO14001 surroundings administration certificate and thereafter handed the inspection of thoroughly clean generation and recycling economic system, successful the title of "Zhejiang Eco-friendly Company".
R series Helical Geared Motor Traits
1. Attributes:
one. Higher effectiveness: ninety two%-ninety seven%
2. Compact construction: Modest offset output, two stage and 3 stage are in the identical box.
3. Large precision: the equipment is produced of high-high quality alloy steel forging, carbonitriding and hardening treatment method, grinding approach to make sure large precision and stable operating.
4. High interchangeability: very modular, serial design, robust versaEPTty and interchangeability.
two. Complex parameters
Ratio | 3.forty one-289.seventy four |
Enter EPT | .12-160KW |
Output torque | sixty one-23200N.m |
Output speed | 5-415rpm |
Mounting variety | Foot mounted, flange mounted, foot and flange mounted, solitary-phase foot mounted, one stage flange mounted, Flange-mounted with prolonged bearing hub |
Enter Strategy | Flange enter(AM), shaft enter(Ad), inline AC motor enter, or AQA servo motor |
EPTrake Launch | HF-handbook release(lock in the brake release situation), HR-handbook launch(autom-atic braking position) |
Thermistor | TF(Thermistor security PTC thermisto) TH(Thermistor safety EPTimetal swotch) |
Mounting Situation | M1, M2, M3, M4, M5, M6 |
Sort | R17-R167 |
Output shaft dis. | 20mm, 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm, 90mm, 110mm, 120mm |
Housing substance | EPT200 substantial-toughness cast iron from R37,47,57,67,77,87 |
Housing material | EPT250 Higher energy solid iron from R97 107,137,147,157,167,187 |
Warmth remedy EPT | carbonitriding and hardening treatment method |
Performance | ninety two%-ninety seven% |
Lubricant | VG220 |
Safety Class | IP55, F class |
Starshine Generate
ZheJiang Starshine Push Co.,Ltd,the predecessor was a point out-owned military mould EPTrprise, was estabEPTd in 1965. Starshine EPTizes in the comprehensive EPT EPT answer for higher-stop equipment producing EPT based mostly on the aim of quotPlatform Item, Application Style and Specialist Services quot.
Starshine have a strong specialized drive with over 350 employees at present, incXiHu (West Lake) Dis.Hu (West Lake) Dis. more than thirty engineering professionals, 30 high quality inspectors, masking an spot of 80000 square meters and kinds of advanced processing EPTs and screening equipments. We have a very good foundation for the industry application deveXiHu (West Lake) Dis.Hu (West Lake) Dis.ment and support of higher-conclude pace EPTs amp variators possessing to the provincial engineering EPT investigation cEPTr,the lab of equipment pace EPTs, and the base of modern R ampD.
Our Group
EPT Management
EPT:Insist on EPTrovement,Try for Excellence With the deveXiHu (West Lake) Dis.Hu (West Lake) Dis.ment of equipment manufacturing indurstry,client by no means satirsfy with the recent high quality of our items,on the contrary,wcreate the benefit of quality.
EPT policy:to increase the all round degree in the area of EPT EPT
EPT Look at:Continuous EPTrovement , pursuit of excellence
EPT Philosophy:EPT creates value
three. Incoming EPT Management
To create the AQL acceptable degree of incoming substance manage, to supply the material for the EPT inspection, sampling, immunity. On the acceptance of competent products to warehousing, substXiHu (West Lake) Dis.Hu (West Lake) Dis.rd products to take return, check, rework, rework inspection responsible for tracking undesirable, to monitor the supplier to just take corrective
actions to avoid recurrence.
four. Approach EPT Manage
The production website of the 1st examination, inspection and ultimate inspection, sampling according to the demands of some tasks, judging the quality adjust trend
identified abnormal phenomenon of manufacturing, and supervise the generation office to boost, get rid of the abnormal phenomenon or condition.
five. FQC(Ultimate QC)
Right after the manufacturing department will comprehensive the solution, stand in the customer's placement on the finished merchandise quality verification, in order to make sure the good quality of
buyer expectations and needs.
six. OQC(Outgoing QC)
Soon after the item sample inspection to decide the experienced, enabling storage, but when the completed merchandise from the warehouse ahead of the formal shipping of the goods, there is a verify, this is called the cargo inspection.Check out material:In the warehouse storage and transfer position to verify, whilst confirming the delivery of the
item is a item inspection to determine the certified items.
7. Certification.
EPT
Shipping